0301-1101 |
maintain personal safety on the job site |
0301-1102 |
identify equipment and related materials commonly used in water-based systems layout |
0301-1103 |
compile information about a project and its systems into drawing(s) in preparation for water-based systems layout |
0301-1104 |
clean up layout drawings for supervisor review |
0301-1105 |
compile submittal packages for supervisor review |
0301-1109 |
communicate effectively |
0301-1110 |
field verify a project |
0301-1111 |
solve basic hydraulic equations and apply those concepts |
0301-3101 |
survey buildings and existing systems to acquire accurate information about features that could impact a water-based system design
|
0301-3102 |
identify types of existing water-based systems |
0301-3103 |
conduct and evaluate water flow tests to determine the adequacy of the water supply |
0301-3107 |
detail a water-based system layout, including related equipment, to meet codes, standards, and specifications
|
0301-3109 |
select, locate, and place hangers on drawings to meet standards and system requirements |
0301-3110 |
prepare a fabrication stock list and a materials list for a system |
0301-3111 |
communicate with AHJs and others in a professional manner |
0301-5101 |
evaluate site conditions relevant to water-based systems layout, and correctly identify the occupancy types, codes, and standards involved
|
0301-5102 |
communicate technical information that is clear and accurate |
0301-5103 |
understand and adhere to contractual obligations |
0301-5108 |
develop and implement an installation strategy, including resolution of on-site scheduling conflicts and issues with other trades and project stakeholders
|
0301-5109 |
plan and oversee a complete and successful system commissioning, including documentation of test completion and creation of as-built drawings
|
0301-5112 |
determine whether a specific device type will meet codes, standards, and project specifications
|
0301-7101 |
evaluate contract documents for feasibility and potential liabilities |
0301-7102 |
evaluate the fire protection provided by existing systems to either a high-rise building or to an industrial facility requiring unusual design criteria or applications of standards
|
0301-7103 |
evaluate the fire protection currently provided to an area of an existing facility which has either flammable liquid storage or high-piled storage
|
0301-7104 |
evaluate 2 of the following 3 types of systems for the adequacy of fire protection provided to existing facilities:
|
0301-7105 |
evaluate the proposed water-based systems for a building in which there is complex hydraulic requirements resulting from multiple occupancies, hazard classifications, and/or water supplies
|
0301-7106 |
understand smoke control zones and how they interface with fire suppression systems
|
0301-7107 |
interpret project concept and specifications for the design team |
0301-7108 |
identify the costs and benefits of system design options |
0301-7109 |
review hydraulic design to optimize system efficiency, identify errors in calculations, and suggest corrections
|
0301-7110 |
manage a project team from concept through project completion |
0301-7111 |
negotiate a compromise among project stakeholders who have conflicting requirements for fire protection systems
|